Serving: Arizona, California, Nevada and Utah   |   HOMES STARTING AT $49,900
Request an Appointment   |   Call Us:  1-800-632-2980

Gantt

Gantt

  • 1865 sq. ft.

  • 3 Beds

  • 2 Baths

  • 32 X 60 Double Wide

  • Legacy Housing

Heritage Series – Multi Section

The Gantt model manufactured by Legacy Housing has 3 Beds and 2 Baths. This 1865 square foot Double Wide home is available for delivery in Arizona, Nevada & Utah. *Not available for shipment to California.

Request Appointment

Standard Features

CONSTRUCTION:

  • Copyrighted Furniture-Friendly Floorplans
  • American Made Single-Piece (Not welded) I-Beam Frame
  • Detachable Hitch
  • Full Length Outriggers / Wall Supports
  • 2×6 Floor Joist 16” O.C.
  • Tongue & Groove O.S.B. Floor Decking
  • Smart Panel Hard Siding
  • Dormers w/ columns per Print on Doublewides
  • R33-11-11 Insulation
  • Radiant Barrier
  • Vinyl Thermal Pane Windows
  • Taupe Wire Shelving in Closets and above Washer/Dryer
  • Satin Nickel Hardware
  • 30-Gallon Electric Water Heater in 1-2 Bedroom Models (50-Gallon in 3+ Bedroom Models)
  • Plumbed and Wired for Washer and Dryer
  • 200-AMP Total Electric
  • Smoke Detectors Throughout
  • Thermal Zone II
  • 12” Front & Rear Overhangs on 16’/24’, 32” & 4” Side Eaves
  • Exterior GFI

ROOF:

  • Singlewides: Composition Shingle Roof – 4/12 Pitch
  • Doublewides: Composition Shingle Roof – 3/12 Pitch
  • 16’ Singlewides: 8’ 6” at Peak Vaulted Ceilings Throughout
  • 32’ Doublewides: 9’ 0” at Peak Vaulted Ceilings Throughout
  • 16’ Singlewides: Over 15’ Interior Floor Width
  • 32’ Doublewides: Over 30’ Interior Floor Width

KITCHEN:

  • 18 CF Refrigerator
  • Post-Form Roll-Top Countertops w/ Bullnose Front Edge and Integrated Backsplash
  • Plentiful Cabinets (Including over Refrigerator)
  • Raised Panel Vinyl-Wrapped Vacuum-Sealed Cabinet Doors (Not Paper)
  • 3/4” Vinyl-Wrapped Cabinet Stiles (Not Paper)
  • Center Shelves with Vinyl Front Edge Banding in Base Cabinets
  • Hidden Cabinet Door Hinges
  • Stainless-Steel Kitchen Sink
  • Kitchen Pantry (Most Models)
  • LED Light(s) in Kitchen

INTERIOR:

  • Factory-Select 34” Steel In-Swing Front Door with Deadbolt
  • Rear Door with Deadbolt
  • Tapeless Ceilings w/ Blown Texture
  • Vinyl Flooring Throughout
  • Raised Panel Interior Doors with Metal Knobs
  • Decorative Valances Throughout, Living Room, Master Bedroom, Drapes in Doublewides
  • Mini-Blinds Throughout
  • Silent Rocker Electrical Switches
  • Choose Colors from a variety of Wallboards, Countertops, Cabinets and Flooring
  • Decorative Residential Vinyl Wall Boards
  • Towel Bars and Toilet Tissue Holders in Bathrooms
  • Medicine Cabinets and Drawers in all Master Baths

Make Your Home Your Own

The Gantt model is manufactured by Legacy Housing and is part of the Heritage Series – Multi Section. Click on the button below to view the available color selections for this floor plan.

VIEW COLOR SELECTIONS

Make Your Home Your Own

The Gantt model is manufactured by Legacy Housing and is part of the Heritage Series – Multi Section. Click on the button below to view the available upgrades & options for this floor plan.

VIEW UPGRADES & OPTIONS